Home >> Case Study
Year of completion:2016
Customer:
Country:

16th Nov, we successfully finished wind turbine's hub machining job for American GE company.This hus is used for a 6MW ocean wind turbine project, now the first set of finished products have been shipped.      


GE Wind Energy was a branch of GE Energy, a subsidiary of General Electric. The company manufactures and sells wind turbines to the international market.


This hub is the wind turbine's core component to connect turbine blade and main shaft, the structure is complex, the volume is big, and the weight is up to 40 tons.Due to the irregular shape of the turbine hub, we use our Italy Pama floor type boring and milling machining center together with universal joint to achieve multiangle machining.


Tags:
  • Tel: +86 592 5580 601
  • Mob: +86 186 5928 0806
  • WhatsApp: +86 186 5928 0806
  • E-mail: bell@openex.com.cn
  • Add.: Unit 2205, No. 170 East Tapu Road, Siming District, Xiamen City, Fujian Province, China.
sheet metal fabrication wall panel part twin shaft paddle dryer shell metal fabricated part sheet metal fabrication for Honeycomb inclined tube large machining for yankee dryer rolling and welding for storage tank large plate rolling and welding Precision machining on large concial steel part large and precision machining on coal mine machinery rocking arm component Heavy Machining On equipment Frame Part -Openex China Top machine shop
Large Machining, Metal Fabrication, Custom Metalworking-Openex
Sitemap

Copyright © Openex Mechanical Technology Ltd. All Rights Reserved

Technical Support: